Need A Permit?
Ohio Codes
Plan Submission
Alarm System Permit
Alley/Street Permit
Building Permit
Commercial/ Business
Curb Cut Permit
Demolition Permit
Driveway Permit
Electrical Permit
Fence Permit
Food Service Permits
Mobile Home Permit
Outbuilding Permit
Plumbing Permit
Pool Permit
Sanitary Sewer Permit
Satellite Dish Permit
Sidewalk Permit
Storm Sewer Permit
Street/Alley Permit
Tree Trimming Permit
Water Tap Permit
Water Meter Installation
Zoning Permit
Zoning Fees
Zoning Variance

 

Electrical Permit

An electrical permit is required when an upgrade or new electrical service is being installed.


Residential electrical permits can be obtained by contacting the Galion Building Department. (419-468-2642)
 

Residential projects requiring an electrical permit would include any construction involving new electrical service, or any upgrade of existing service (example: a change from 60 to 100 amp service). A permit may also be required if relocating the meter.

Sketches and specifications are available to assist you in your project at the Galion Building Department. Feel free to stop there if you need assistance.
 

Replacing existing wiring or adding new receptacles when remodeling requires an alteration permit from the Building Department located in the Galion City Building, 419-468-2642 and an electrical permit.


Meter Tampering: At no time shall anyone tamper with meter base, meter, or service connection in any way. Anyone tampering or attempting to tamper with a meter will be subject to a $100.00 fine and/or loss of service. If you need your meter base removed or loosened for new siding or any other reason, contact the City Electric Division to do this for you.

Inspections needed:
Rough-in (before wiring is covered by insulation or drywall)
Final (upon completion, but before use or occupancy)
Note: It is your responsibility to call the City Building/Zoning Office at 468-2642 at least 48 hours prior to rough-in inspection and at least seven days prior to occupancy or use.

 

Required for permit:
Construction Plan or
Wiring Plan
Site Plan

Other permits you may need:
Building
Plumbing
Zoning

 

Home              Contact Us Private Policy  Legal NoticeDownload Adobe Acrobat Reader
Revised: 06/24/2011
 This website is created, sponsored and maintained by the City of Galion, Ohio. 
All materials, graphics and photos are owned and copyrighted and may not be copied, downloaded or used
 elsewhere without the written permission of the City of Galion, Ohio